What a real quote should tell you.

Excavation
Depth, and what happens to the spoil
Sub-base
Material and compacted thickness
Edging
How the perimeter is restrained
Drainage
Where the water actually goes
  • Written, itemised quotesExcavation, sub-base, edging and drainage priced separately
  • Site survey before pricingNobody prices a driveway properly from a satellite photo
  • Compliant surface water drainageBuilt to meet the 2008 permeable-surface rules, not around them
  • Local installers onlyCrews working their own patch, not a national call centre

Almost every driveway that fails does so for the same reason, and it is never the blocks. It is the 200mm of compacted stone that should be underneath them and is not.

PaveLocal exists to make that visible before you spend anything. Every quote we write itemises the excavation depth, the sub-base material and thickness, the edge restraint and the drainage solution — so when you hold it against another quote, you can see where the two differ instead of comparing two totals.

We work across Northamptonshire, Buckinghamshire and Bedfordshire with local installers, and we will tell you when a repair is a better use of your money than a replacement.

Driveway types

Six surfaces, honestly compared.

Each of these has a page explaining how it is built, what it costs and where it is the wrong choice.

Close-up of clay-coloured paving blocks laid in a herringbone bond

Block paving

The most popular choice, and the only common surface that can be lifted and relaid invisibly if a section settles or a service trench goes through.

Cost
£80–£140/m²
Life
20 years+
Block paving
Close-up of a bound aggregate surface, wet, showing the individual stones

Resin bound

Seamless and permeable, laid in a day over a sound existing base. Excellent value in that case, and the wrong answer over block paving.

Cost
£70–£120/m²
Life
15 years+
Resin bound
Close-up of a dark asphalt surface showing its granular texture

Tarmac

The cheapest way to cover a large area properly. Long drives and rural approaches, where block paving would be both expensive and slightly absurd.

Cost
£45–£90/m²
Life
15–20 years
Tarmac
A thatched English cottage with a gravel driveway, five-bar gate and stone boundary wall

Gravel

Permeable by default, so no planning question at all. Laid in a stabilising grid it stays put; tipped loose over membrane it ends up in the road.

Cost
£40–£80/m²
Life
10–20 years
Gravel
A power screed levelling freshly poured concrete over steel reinforcement

Pattern imprinted concrete

One continuous stamped slab. Strong and jointless, but it cannot be repaired invisibly and it needs resealing every three to five years.

Cost
£70–£120/m²
Life
15–20 years
Pattern imprinted concrete
Sawn granite setts laid in a stretcher bond with tight joints

Natural stone

The most expensive option and the only one that improves with age. On a period or conservation frontage it is the correct material, not an indulgence.

Cost
£120–£220/m²
Life
30 years+
Natural stone

How it works

How a driveway job actually runs.

Four stages. The timings below are what these jobs really take, not the best case with everything going right.

  1. 01

    Send us the basics

    Postcode, rough size, and what is there now. A photo of the existing drive from the pavement tells us more than a paragraph does.

    Same day, usually within a few hours.

  2. 02

    Site survey

    Someone comes out, measures up, checks levels and finds out where the water currently goes. This is also when access gets checked — a machine that cannot reach the back of the plot changes the price.

    Typically within a week of your enquiry.

  3. 03

    Itemised written quote

    Dig depth, sub-base type and thickness, edging, drainage solution, surface material and make-good. Separate lines, so you can hold it against another quote and see where they differ.

    2–3 working days after the survey.

  4. 04

    Installation

    A typical two-car driveway is three to five working days on site: dig out and cart away, lay and compact the sub-base, edge it, then surface it. Resin and concrete both need a dry weather window, so dates move in a wet week.

    Lead time depends on the season — spring and early autumn are the busiest.

Stage one of five Dig out to a firm formation and cart the spoil away. Everything the finished surface does depends on what happens here. Illustrative footage — see credits.

Areas covered

Where we work.

Eleven towns with their own local page, covering the ground conditions, the council that handles dropped kerbs, and the housing stock in each.

Towns with a local driveway page

Northampton, Milton Keynes and Bedford each have separate pages for block paving and resin as well. Everything else in between is covered too — see the full list on the areas page.

Also covered Bletchley, Wolverton, Stony Stratford, Newport Pagnell, Olney, Woburn Sands and Winslow, plus the villages between them.

FAQ

Driveway questions, answered straight.

How much does a new driveway cost?

As indicative ranges for this region: block paving roughly £80–£140 per square metre installed, resin bound £70–£120 over a sound base, tarmac £45–£90 and natural stone £120–£220. Ground conditions, access and how much spoil has to be carted away move those figures significantly, which is why a firm price should follow a survey rather than a phone call.

Do I need planning permission for a driveway?

Not if the surface is permeable, or if the water drains to a soakaway or planted area within your own property. You do need it for more than five square metres of impermeable surface at the front of a house draining onto the road. A dropped kerb is a separate application to your local highway authority.

How long does a driveway take to install?

Three to five working days for a typical two-car drive: dig out and cart away, sub-base, edging, then the surface. Clay ground adds time. Resin and concrete both need a dry weather window, so a wet week moves the date.

Which driveway surface lasts longest?

Natural stone, then block paving — both are laid as individual units, so they can be lifted and relaid rather than replaced. Every surface lasts longer or shorter almost entirely according to the sub-base under it, which is the part you cannot see and the part cheap quotes cut.

What areas do you cover?

Northamptonshire, Buckinghamshire and Bedfordshire — Northampton, Milton Keynes, Bedford, Aylesbury, Leighton Buzzard, Luton, Towcester, Dunstable, Wellingborough, Buckingham and Brackley, plus the towns and villages between them.

Reviews

What customers say.

PaveLocal is a new name and we are not going to show you reviews we have not earned. These slots fill with real, verifiable reviews as jobs are completed — name, town, and a link you can check.

[ Review to be collected ]

Awaiting first review

[ Review to be collected ]

Awaiting first review

[ Review to be collected ]

Awaiting first review

Free quote

Get a free quote.

Send your postcode and a rough size and we will arrange a survey. A photo of the drive from the pavement tells us more than a paragraph does.

  • Itemised, in writingExcavation, sub-base depth, edging, drainage and surface priced as separate lines, so you can compare quotes properly.
  • Surveyed before it is pricedGround conditions decide the cost of a driveway. Anyone quoting a firm price off a photo is guessing.
  • No obligationA quote is a quote. If you use someone else, that is fine — we will not chase you about it.

Prefer to talk it through? Call 07346 814806 or email hello@pavelocal.co.uk.

How should we get back to you?

No obligation and no hard sell. We use your details to quote your driveway and nothing else — see the privacy policy.